PriceList for Fruit Chiller - 2MM Self Leveling Epoxy Floor Paint – Airwoods

Short Description:


Product Detail

FAQ

Related Video

Feedback (2)

As a result of ours specialty and service consciousness, our company has won a good reputation among customers all over the world for Iso 7 Cleanroom Design, Top Air Purifiers, Clean Room Air Conditioner, We believe in quality over quantity. Before export of the hair there is strict quality control check during treatment as per international quality standards.
PriceList for Fruit Chiller - 2MM Self Leveling Epoxy Floor Paint – Airwoods Detail:

JD-2000 is a two-component solvent-free epoxy floor paint. Nice appearance, dust &corrosion resistant and easy to clean. The flooring system can bond well with the solid base and has good abrasion and wearing resistance. Meanwhile, it has certain toughness, brittle-resistance and can stand a certain weight. The compressive strength and impact resistance ability is also excellent.

Where to Use:
It is mainly used for the non-dusty and non-bacteria areas like food factory, pharmaceutical factory, hospital, precision machinery, electronic factory, etc.

Technical Data:
Drying time:  Touch dry: 2 hours        Hard dry: 2 days
Compressive strength (Mpa): 68
Impact resistance strength (Kg·cm): 65
Flexural strength (Mpa): 40
Adhesive force grade: 1
Pencil hardness (H): 3
Abrasion resistance(750g/1000r, zero gravity, g)≤0.03
Resistance to engine oil, diesel oil for 60 days: no change.
Resistance to 20% sulfuric acid for 20 days: no change
Resistance to 20% Sodium hydroxide for 30 days: no change
Resistance to toluene, ethanol for 60 days: no change
Service life: 8 years

Recommended Consumption:
Primer: 0.15kg/sqm           Undercoat: 0.5kg/sqm+Quartz Powder: 0.25kg/sqm             Top coat: 0.8kg/sqm

Application instructions:
1. Surface preparation:Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles, oil, grease, and other contaminants.
2. Primer: Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/㎡.The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours.
Inspection standard for the primer: even film with certain brightness.
3. Undercoat: Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure.
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface.
4. Top coat: Mix JD-2000A and JD-2000B according to 5:1 and then apply the mixture with trowel. The consumption quantity is 0.8-1kg/sqm. One coat is enough.
5. Maintenance: 5-7 days. Don’t use or wash with water or other chemicals.

Clean up

Clean tools and equipments first with paper towels, then clean the tools with solvent before the paint hardens


Product detail pictures:

PriceList for Fruit Chiller - 2MM Self Leveling Epoxy Floor Paint – Airwoods detail pictures


Related Product Guide:

We pursue the management tenet of "Quality is superior, Service is supreme, Reputation is first", and will sincerely create and share success with all clients for PriceList for Fruit Chiller - 2MM Self Leveling Epoxy Floor Paint – Airwoods , The product will supply to all over the world, such as: Zambia, Iran, Norwegian, Now we are sincerely consider to grant brand agent in different areas and our agents' maximum margin of profit is the most important thing we care about. Welcome all of the friends and customers to join us. We are ready to share win-win corporation.
  • The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Miranda from Ethiopia - 2017.04.08 14:55
    The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Amber from Tajikistan - 2018.09.21 11:44

    Send your message to us:

    Write your message here and send it to us
    Leave Your Message